Value Engineering Updates
- Prescriptive wall bracing in 2009 IRC still leads to fewer holdowns than engineered shear walls.
- Wood sleepers for basements can be eliminated by alternative basement wall design.
- 5-inch P.T. slabs continue to beat conventional footing and stem on coast, cycle time and performance.